Hong Kong Science Park

Office Reinstatement

How Agrey Returned

13,000 sq ft to Bare-Shell Condition in Just 8 Weeks

· Office Reinstatement
Science Park 16E Building Outside: “Exterior view of Hong Kong Science Park Building 16E with glass curtain walls under a clear blue sky
“Wide view of open-plan floor with ceiling grid panels removed and construction debris”  “Close-up of ceiling grid sections and ductwork exposed above suspended ceiling”  “Partially dismantled stud partition wall framing during strip-out phase”  “Mid-installation view showing ceiling tiles and lighting fixtures pulled back for access”  “Construction debris and cable bundles on floor next to a red step ladder under the ceiling grid”
“Red toolbox with electrical hazard warning labels and site permit documents affixed”  “White Korel safety helmet resting on an orange tool chest in the bare shell office”  “First aid box mounted on an orange site cabinet with emergency sign”  “Group of fire extinguishers and small CO₂ bottles staged on concrete floor”  “Temporary power distribution box with safety instructions poster and cabling”  “Red folding work platform ladder positioned beneath a partially removed ceiling grid”
New Ceiling Panels: “Stacks of Ecophon ceiling panels and integrated light troffers staged for installation during the office reinstatement.”
New Raised Floor Panels to be installed: “Bundles of 600×600 raised floor panels wrapped in cardboard and strapped, lined up along the perimeter before installation.”
Completion Photo of the Reinstatement Unit: “Bare-shell office interior looking out over Science Park’s iconic Golden Egg pod after reinstatement.”

Agrey Office Reinstatement Project Team in Hong Kong