Office Reinstatement Project - The Center 28
Size: 1900 sqft (28/F)
Scope: Full office reinstatement to bare shell condition
Timeline: Completed in 4 weeks
Works Included: Full builder works + Nominated Contractors + PM services
Result: On-time handover, deposit fully returned
Project Overview:
Agrey Office Contracting Limited completed a 1,900 sqft office reinstatement project at The Center – 28/F, a premium Grade A office building in Central, Hong Kong.
Scope of Works:
Removal of all tenant-built partitions, ceilings, raised flooring, and built-in fittings
Reinstatement of MVAC (Mechanical Ventilation & Air Conditioning) systems
Restoration of Fire Services (FS) — sprinkler heads, smoke detectors, and alarms repositioned
Disconnection and removal of Plumbing & Drainage (P&D) components
Reconnection and reinstatement of the main power cable
Replacement of any damaged ceiling panels, raised floor panels, and ceiling light panels to match the original landlord specifications
Final surface touch-up, repainting, and site clearance for a clean bare shell handover
Agrey worked closely with nominated contractors and building management to ensure all reinstatement requirements were met. With a 2-week preparation lead time followed by 4 weeks on-site work, the project was delivered on schedule and passed handover inspection successfully — allowing the client to recover their full deposit without issue.